Engineering Surveying Planning Construction Management
Bridgewater Plaza

 

 

Bridgewater Plaza Central Sewer System
Franklin County, Virginia

Project Owner:Bridgewater Plaza      
http://www.bridgewaterplaza.com/                           

Services Provided: Planning and Preliminary Engineering, Final Design

ACS DESIGNThis photo shows the BioWheel Master Control Panel and sludge holding tank regenerative blower assembly.

 

 

 




ACS DESIGN
This photo shows the BioWheel drive motor and reduction gearbox with protective safety cage.

 

 

 



ACS DESIGN  This photo is of the Effluent Splitter Manifold Assembly which provides highly accurate loading of individual mass drainfields
 

 

 

 



ACS DESIGN
This photo shows the Bridgewater Plaza WWTP Facility under construction.  Note that the Effluent Pump Station, Valve Vault, and Laboratory Building are shown.

 

 

 

ACS DESIGNThis photo shows the 50,000 GPD BioWheel Package Plant under construction after placement on subsurface concrete pad.  This view is from the clarifier looking to the front of the treatment plant.

 

 

 


ACS Design
  Roanoke Office:
2203 Peters Creek Road
Roanoke Virginia 24017
(540) 562-2345
(540) 562-2344 Fax
Smith Mountain Lake Office:
13399 Booker T. Washington Highway
Hardy, Virginia 24101
(540) 719-2345
(540) 719-7963 Fax